Tips for Managing and Minimizing IBM MLC Monthly Run Rates 

This article summarizes steps and options clients can use to control and hopefully minimize the cost of their monthly run rates for mainframe software.  

This article summarizes steps and options clients can use to control and hopefully minimize the cost of their monthly run rates for mainframe software.  

Monthly Run Rates

As a base case, let’s assume one IBM processor is rated at 1,000 MSUs, and the machine is running z/OS on several LPARs. Further, assume that all LPARs run one or more of IBM’s major subsystems: DB2, CICS, IMS, and/or MQSeries. These four products, along with z/OS, are all Sub-Capacity products, which means the licensing is for peak-hour MSU usage.  

With this in mind, clients can adopt various licensing steps and options. 

  1. Full-Capacity – This option will bill each Sub-Capacity product at the full machine capacity of 1,000 MSUs. The only benefit would be that the monthly bill remains constant, and there is no need to submit SCRT reports to IBM. The disadvantage is the monthly price would be high. No client should use this option unless there is some overriding reason for doing full-capacity pricing. 
  1. Sub-Capacity – This is the option 99+% of clients use. It requires the installation to collect data during the month, use this information as input to the SCRT program, and submit the SCRT report to IBM. The work requires collecting and reporting, but this effort is minimal. Assuming the client’s peak rolling 4-hour average (R4HA) is 80%, that would result in the usage of 800 MSUs for all of the Sub-Capacity products. This could provide an approximate saving of 20% in billing relative to Full Capacity. Depending on the actual MSU size of a client’s machine, the savings could even be higher. There is no reason why an installation would not want to do Sub-Capacity pricing. 
  1. Lower Peak House Usage – Once Sub-Capacity is being used, the next step would be to analyze when the peak hour occurs and change job scheduling to lower the MSU usage at the peak hour. This is an iterative process until the lowest peak is found. Assume, in our case, the new peak hour is 77% usage or 770 MSUs. Again, this would lower the cost relative to step 2 above. It may not be possible to have this lower peak happen every month. However, if it were to occur in 9 out of the 12 months, that would provide good savings. 
  1. Capping Machine Usage – A client could attempt to lower the monthly cost by implementing the LPAR Capping options available with the IBM processors and z/OS. The objective could be to cap all the LPARs to minimize peak-hour usage. Since this option is really “soft capping,” the financial result is to limit the monthly cost. Assume the client determines that the machine could “run” at 70% utilization and still provide good service and meet their SLA. In that case, the maximum billing of the Sub-Capacity products would be 700 MSUs. Of course, if the peak in a certain month were only 67%, the cost would be based on 670 MSUs. 
  1. Non-Metered LPAR – Another option to consider is the creation of a new LPAR that would run z/OS but none of the major subsystems, i.e., no DB2, CICS, IMS, or MQSeries. The client would move as much batch work as possible to this new LPAR. The goal is to separate batch work from the major subsystem products. Consider what could happen. Looking at option two above, z/OS and the subsystems all bill at 800 MSU (80% usage). Assume that the new LPAR runs at 20% usage (200 MSUs) and the total of the remaining LPARs is lowered to 60% usage (600 MSUs). From a cost standpoint, z/OS would still bill at 800 MSUs, but all the major subsystems would bill at 600 MSUs. There is no billing per se for batch. The net result is a reduction of 200 MSU usage for each major subsystem product, which, in this example, is a 25% reduction. It is fair to assume that z/OS represents 30% of the MLC run rate, and the major subsystems represent 65%. By creating the new LPAR, 65% of the bill would be reduced by 25%, roughly an 18% savings. This option could be useful if making a “batch only” LPAR is feasible within the client’s business processing philosophy. 

Conclusion 

z/OS and the major subsystems account for at least 95% of the MLC monthly run rate. With that in mind, emphasis should be on two items:  

  1. Lower the peak R4HA CPU utilization to reduce the MSU usage and cost of z/OS. 
  1. Lower the peak R4HA LPAR utilization to minimize the major subsystems’ MSU usage and cost. Reduction in overall CPU utilization will lower the LPAR peaks in itself. Additional actions, such as separating batch work from online work within an LPAR, would also help.    

Further Reading

About author
Len Schaider
Len Schaider
IBM License Expert
Currently an SME in license and asset management of IBM mainframe MLC software. Len’s experience includes license verification to ensure compliance and validation of MLC Run Rates. Other expertise is tracking HWM usage and the status of zOTC products. These skills are backed by 30+ years working for IBM, providing technical marketing support for mainframe software, hardware, and overall system operations at customer locations. His background includes a full-time instructor teaching “MVS Operating System Internals” and an IT Specialist helping mainframe customers with performance, tuning, and z/OS systems support.

Read Next

IBM's Client Value Acceleration (CVA) program is being aggressively promoted as a cost-saving opportunity with audit protection benefits. But there are significant risks IBM sales teams don't discuss in enrollment conversations.

IBM CVA: The Risks They Don’t Tell You

How to Close an IBM License Compliance Gap

When Is an IBM Subscription Deal Not a Good Deal?